Quick answer: An EV Testing Equipment Case carries insulation values, leak-down figures and cell deltas, and one wrong number sends the report back for a second visit.

Table of contents

  • Instrument List for High-Voltage Checks
  • Fixing the Insulation Tester Inside
  • Where Leak-Down and Cell Delta Records Live
  • How Site Humidity Moves the Reading
  • Tying Test Data to the Case Serial
  • FAQ

1. Instrument List for High-Voltage Checks

The first instrument for a high-voltage check is an insulation tester, not a multimeter. A 400 V platform takes the 500 V DC setting and an 800 V one the 1000 V DC setting, over a 0.1 MΩ to 10 TΩ range.

The statutory floor scales with voltage: 100 Ω/V puts a 400 V system at 40 kΩ and an 800 V system at 80 kΩ. Those are minimums, not pass marks; healthy hardware reads in the tens of MΩ.

An EV Testing Equipment Case also carries a multimeter, there to prove the bus has fallen under 30 V after shutdown, plus a clamp meter for charge current.

GB/T 16739.1-2023 asks an EV workshop to hold six classes of battery equipment, insulation and leak testers and pack chargers among them. More instruments mean more cavities, one each.

Bus capacitors often exceed 1000 μF, about 80 J at 400 V, and falling under 60 V takes 3 to 5 min. Tape the discharge timetable inside the lid of the EV Testing Equipment Case.

InstrumentWhat it readsRange settingCheck before packing
Insulation testerBus to chassis500 V DC or 1000 V DCLeads unbroken, range switch free
Digital multimeterResidual voltage after shutdown1000 V DCBattery level and lead insulation
Clamp meterCharge and discharge current0–1000 AJaws close square, zero set
Leak testerPack shell pressure drop0–50 kPaHose fittings and O-ring
Pack chargerCapacity and internal resistanceBy pack voltageCable lock and earth bond

2. Fixing the Insulation Tester Inside

EV Testing Equipment Case strapped to a wooden pallet with two webbing belts in a warehouse aisle, latches and handle facing camera
EV Testing Equipment Case strapped to a wooden pallet with two webbing belts in a warehouse aisle, latches and handle facing camera

An insulation tester weighs 2 to 3 kg, and a drop multiplies that by a dozen in inertia. A shaped cavity is not enough: a strap holds the body and lid foam takes up the rest.

Face the dial up and coil the high-voltage leads apart. Once a lead jacket is pinched, the meter reads the leakage of its own lead instead of the vehicle.

Leads run 1.5 to 3 m, coiled to 15 cm and taped at both ends; a bundle dropped into a cavity loads the plugs and loosens the contacts. An EV Testing Equipment Case keeps the lead bay separate for that reason.

Sealing on an EV Testing Equipment Case follows IP67: dust tight and 1 m of water for 30 min. IP67 does not cover spray, so a pressure washer still puts water past the gasket.

The rejection line is three consecutive self-test failures on power-up, or 2 mm of cumulative movement in the insert cavities, and either one stops the van.

3. Where Leak-Down and Cell Delta Records Live

A leak test is read as pressure drop, not as sound. Inflate the pack to its set pressure, hold 5 min, and log the start and end values; an over-limit drop sends the technician to the sealing face.

Cell delta and temperature spread answer a different question. A freeze frame showing more than 300 mV between cells points to capacity fade, while a spread above 5 C points to a blocked cooling channel or a weak pump. Both numbers travel with the sample ID.

Two carriers ride in the EV Testing Equipment Case: a paper sheet that goes with the vehicle, and a tablet holding the electronic file. Paper survives a flat battery, the tablet exports charts.

Keep the EV Testing Equipment Case archive for three years. When the same vehicle returns, last year's delta curve explains more than a fresh one.

RecordHow it is takenWhere it livesKept for
Pack pressure dropStart and end values over 5 minPaper sheet in the case3 years
Cell deltaFreeze frame exportTablet file3 years
Module temperature spreadSensor readoutTablet file3 years
Insulation valueDirect readingPaper sheet plus photo3 years

4. How Site Humidity Moves the Reading

EV Testing Equipment Case, dark grey, open on a bench, circuit board with ribbon cables in round foam, soldering iron at right
EV Testing Equipment Case, dark grey, open on a bench, circuit board with ribbon cables in round foam, soldering iron at right

On an EV Testing Equipment Case run, insulation resistance follows humidity. Above 80% RH the leakage path across a dirty terminal climbs, and a reading can fall by half; wipe the surface dry and measure again.

Temperature pushes the other way. Cold electrolyte thickens, internal resistance rises, and a cold pack reads higher; 20% between a 25 C test and a −10 C test is not a fault.

An EV Testing Equipment Case that moves between climates needs 2 h of settling. Carried from a 5 C vehicle into a 25 C bay, it condenses inside and fails self-test.

Log the humidity: a report that says pass without the conditions cannot be defended three months later.

Site conditionShift in readingResponseRecheck
Above 80% RHInsulation reads lowDry terminals, vent 10 minTwo readings, take the stable one
Ambient at −10 CInsulation reads highLet the vehicle sit 30 minCompare with the warm baseline
Swing of 20 C or moreSelf-test failsSettle 2 h before power-upRun self-test three times
Rain, outdoor bayWater on terminalsFit the rain cover firstNote weather and time

5. Tying Test Data to the Case Serial

The case serial is the key for the whole record set. Build it from instrument type plus a sequence, IR-07 for instance, and give every instrument a child number under that prefix so file names follow.

Binding starts at purchase: fix the number, then label the instruments. From there one EV Testing Equipment Case owns one instrument set, one calibration file and one history.

A QR label on the outside of the EV Testing Equipment Case opens the inventory, the next calibration date and the last three trips, so checking the case becomes checking the account.

Renumbering breaks the chain: swapping cases without swapping numbers, or the reverse, detaches the history for good.