Quick answer: Case Internal Divider specs are derived backwards from cell load. A 2.5 kg cell sets 96 mm cell width, which sets 20 mm EVA blocks, which sets slot width and the tolerance chain. Going from 20 to 25 mm blocks adds 11 yuan per part; one rework of 25 minutes at 32 yuan an hour costs far more.

Table of contents

  • Load First: Where Case Internal Divider Specs Start
  • Cell Width, Foam Thickness, Structure
  • Three Ways, Side by Side on Cost
  • Tolerances and Rework: When Cheap Turns Expensive
  • FAQ

1. Load First: Where Case Internal Divider Specs Start

Take a cavity of 420 by 320 by 150 mm holding 12 items of 1.8 to 2.5 kg, drop tested at 1.2 m on six faces. A Case Internal Divider cannot start with how many cells look right. Start with the longest item, 310 by 80 mm, one per cell along the 420 mm direction, then the load of 2.5 kg per cell.

The sequence is fixed: load sets cell width, width sets thickness, thickness sets slot width, shrinkage sets the tolerance chain.

Load per cellCell widthBlock thicknessSupportCost per part
Under 1 kg110 mm15 mm EVABonded four sides26 yuan
1 to 2 kg100 mm20 mm EVAThree sides plus floor pad31 yuan
2 to 3 kg96 mm25 mm EVAThree sides, pad, top press42 yuan
Above 3 kg80 mm25 mm EVA plus 5 mm PPFully enclosed57 yuan

2. Cell Width, Foam Thickness, Structure

Four cells in 420 mm give 96 mm each, leaving 36 mm for three 5 mm walls and 10 mm at each end. Five cells drop to 76 mm, too narrow for an 80 mm item; three cells reach 130 mm, where a 2.5 kg load bulges the block by more than 2 mm.

Case Internal Divider: black hard-shell case on a white table, two yellow latches near the camera, arc handle recess, thin ribs on the lid
Case Internal Divider: black hard-shell case on a white table, two yellow latches near the camera, arc handle recess, thin ribs on the lid

Block thickness follows cell width. EVA at 65 kg/m³ and Shore C 38, 20 mm thick over a 96 mm cell, sinks 1.2 mm under 2.5 kg and deflects 4 mm at the drop peak, still elastic. At 15 mm it sinks 2.6 mm and peaks at 7 mm, crushing cells shut. The gain of 25 mm appears after the drop: residual set falls from 1.8 to 0.6 mm.

Structure splits at 3 kg, where EVA only cushions and a 5 mm PP panel takes lateral location in blind slots, cut at panel thickness plus 0.6 mm. Split that way, EVA drops from 25 to 20 mm and the assembly gets 3 yuan cheaper.

Processing belongs in the spec: die cutting holds plus or minus 0.8 mm on the edge and 0.5 mm on squareness. Corners and reliefs need CNC routing at 0.3 mm, where a 6 mm cutter limits inside corners to R3. Hot pressed EVA trays run at 155 °C and 2 percent shrink, so tools are cut oversize.

3. Three Ways, Side by Side on Cost

Cost itemDie-cut EVAHot pressed trayPP plus EVA
Material31 yuan42 yuan26 yuan
Labour9 yuan6 yuan11 yuan
Tooling amortisation0 yuan3.6 yuan1.8 yuan
Cost per part41 yuan52 yuan40 yuan

Amortisation assumes 500 pieces: 1800 yuan for the press tool, 900 for the injection tool. At 100 pieces those become 18 and 9 yuan, the pressed part jumps to 66 yuan, and die cutting wins.

Scrap is a rework figure: the 8 percent on PP panels is mostly slot whitening, and one scrapped panel drags a 25 minute rework.

4. Tolerances and Rework: When Cheap Turns Expensive

An unbalanced tolerance chain makes cheap expensive, on the line rather than on the quote.

Case Internal Divider: blue hard-shell case on a white table, two red latches at the front corners, recessed handle and ribbed lid
Case Internal Divider: blue hard-shell case on a white table, two red latches at the front corners, recessed handle and ribbed lid

Across 420 mm, 0.5 percent shrinkage takes 2.1 mm out of the length. Three walls held to plus or minus 0.15 mm and cells to 0.3 mm put 1.2 mm of position error at the far cell, which will not seat against a side wall. Laying cells out from the centre is a tolerance requirement.

  • Position error past 1.2 mm adds 3 minutes of hunting per case.
  • Blocks off by more than 0.3 mm will not press flat in one cell.
  • Edges out of square by 0.5 mm open a seam and the adhesive lifts.
  • A tray cut without the 2 percent allowance eats the end clearance.
  • A slot at 0.3 instead of 0.6 mm needs a mallet and whitens.

The rework arithmetic: 8 minutes to open, 6 to strip, 9 to fit, 2 to recheck, so 25 minutes at 32 yuan an hour is 13 yuan, plus a 41 yuan scrapped part, plus 60 yuan per case in freight once shipped. Spending 11 yuan more per cell breaks even after one avoided rework.

Conclusion

Case Internal Divider specs are a chain that starts at load: weight per cell sets cell width, width sets block thickness, thickness sets slot width, and shrinkage sets the tolerance chain. Every link can be cheapened, and every saving returns doubled at rework, so the 11 yuan per cell normally pays for itself after one avoided rework.

This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.