Quick answer: A grenade transport case quote only becomes comparable after it is split into tooling, per-unit conversion and freight. Minimum order quantity follows from cavity count and changeover time, and lead time runs backward from drawing freeze.
Table of contents
- Three Cost Blocks in a Quote
- Per-Unit, Per-Kilo and Per-Hour Pricing
- MOQ and the Mould Cycle Break-Even
- Lead Time Counted Backward
- RFQ and Payment Milestones
- FAQ
1. Three Cost Blocks in a Quote
A single line reading 160 yuan per unit hides where the money goes. Split a grenade transport case purchase into one-time tooling, per-unit conversion and freight; only conversion scales with volume, so a blended figure lets either side bury margin.
For a 5.2 kg finished case, one mould costs 42,000, sampling 3,000 and testing 1,800. The 46,800 total lands at 78 per unit across 600 pieces and 19.5 across 2,400.
| Block | Contents | Basis | Room to negotiate |
|---|---|---|---|
| One-time | Mould, samples, revision, report | Per project | Shared tooling, fewer cavities |
| Per-unit | Shot weight, cycle, assembly, packing | Per piece, falling with volume | Thinner non-structural ribs |
| Freight | Trucking, customs, ocean | Per container and lane | Consolidated loads |
2. Per-Unit, Per-Kilo and Per-Hour Pricing
The same grenade transport case body can be quoted per piece, per kilo or per machine hour, and the readings diverge by 18 percent. Per-piece hides tooling amortisation in the unit price.
Per-kilo fails on gross versus net: some multiply finished weight by resin price, others take gross weight plus 8 percent regrind loss, and masterbatch on dark parts runs 2 to 3 percent.
Per-hour is transparent but hard to check. A 1,000 tonne press on one cavity at a 205 second cycle yields about 0.057 machine hours per case; quote 260 seconds and labour grows by a quarter.
3. MOQ and the Mould Cycle Break-Even
Minimum order quantity is derived, not announced. A grenade transport case mould costing 42,000 lasts about 250,000 shots, so one cavity would need a quarter of a million pieces to wear out. Changeover is the real cost line: each swap plus first-article approval takes 90 minutes of press time the batch absorbs.
That puts single-cavity break-even at 600 pieces. Below it setup cannot be spread; above 2,400 the marginal gain flattens and further cuts must come from resin.
| Volume band | Unit price | Tooling per unit | Delivery |
|---|---|---|---|
| 600 pcs | 186 | 78 | 42 days |
| 1,200 pcs | 158 | 39 | 38 days |
| 2,400 pcs | 141 | 19.5 | 35 days |
| 5,000 pcs | 133 | 9.4 | 33 days |
4. Lead Time Counted Backward
Lead time on a grenade transport case starts the day the drawing is frozen. Put that in the contract, or two weeks of revisions get counted as production and the shipment lands half a month late.
Count backward on 2,400 pieces: steel day 7, first trial day 18, second trial day 26, production day 34, 380 pieces a day finishing in 6.3 days, inspection 3 days, customs 5 days, ocean 18 days. The path runs 66 days, so write 72 with five days of buffer.
| Milestone | Day | Precondition | Usual delay |
|---|---|---|---|
| Drawing freeze | 0 | Signed 3D file | Cavity changes |
| Steel and base | 7 | Tooling payment | Base misfit |
| First trial | 18 | Flow analysis passed | Sink marks |
| Second trial | 26 | First-article review | Latch fit off |
| Production | 34 | Resin on site | Press conflict |
| Inspection and loading | 43 | Sampling plan | Batch fails |
5. RFQ and Payment Milestones
A specific RFQ returns comparable numbers: drawing and revision, resin grade, colour code, shot weight, insert format, printing, packing, volume band, delivery point. Leave one blank and the supplier fills it with a default.
Tie payments to deliverables: thirty percent at signature releases tooling, forty after the trial sample is signed, thirty after inspection clears the batch.
Five clauses belong in the contract: mould ownership transfers to the buyer, inspection at AQL 1.5, late delivery at 0.5 percent per day capped at 10 percent, a 45 day quote validity, and a price review past an 8 percent resin index move.
Conclusion
Procurement of a grenade transport case comes down to three tables: cost split into blocks, volume into bands, lead time into milestones with a five day buffer. Align them before arguing about unit price, then lock mould ownership and inspection criteria into the contract. Bought this way, a grenade transport case can be reordered without restarting the negotiation.
This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.
Related Reading
- Setting dimensions and wall thickness for a grenade transport case
- Acceptance criteria and inspection items
- What to check during trial moulding
- Writing an RFQ that returns comparable quotes
Related Products
- 8 Series — Gun Cases; Military Equipment Cases; Camera Equipment Cases; Drone Cases; Watch Cases; Knife Cases; First Aid Cases; Electronics Equipment Cases
- WL8-2812 PP Gun Case — model WL8-2812
- All protective cases and toolboxes: 7 series, 158 models