Quick answer: Acceptance of a grenade transport case runs on three defect classes: critical items take zero acceptance, major items are sampled at AQL 1.5, minor items at AQL 4.0. A 500-piece lot draws 80 samples, and one critical defect sends the whole lot back.

Table of contents

  • Lot formation and sampling for a grenade transport case
  • Dimensional and visual inspection items
  • Seal and hardware performance judgement
  • Drop, stacking and thermal cycling verification
  • Decision rules and nonconforming disposition
  • FAQ

1. Lot formation and sampling for a grenade transport case

Inspection starts with lot formation, because a badly drawn lot makes every later number meaningless. A lot must share one mould number, one colour, one material batch and one press, produced in one continuous run, capped at 500 pieces.

A 500-piece lot maps to sample code J, which means 80 samples at general inspection level II. Critical defects, those breaking the seal or load path, run at AQL 0.065 with zero acceptance. Major defects sit at AQL 1.5 and minor cosmetic ones at 4.0.

ClassTypical itemsAQLAc/Re at 80 samplesDisposition
CriticalThrough crack, wall below limit, seal failure0.0650 / 1Lot rejected
MajorOversize, low latch force, hinge crack1.53 / 4100% sort or rework
MinorSink marks, flow lines, colour shift4.07 / 8Concession or sort

2. Dimensional and visual inspection items

Only drawing-critical dimensions are measured: outer size 620×420×230 mm at ±1.2 mm, wall 3.8 mm at ±0.15 mm, and rim flatness 0.6 mm. Any one out of tolerance is a major defect, since size drives stacking, wall drives load capacity, and flatness decides whether the gasket loads evenly.

Outer size is measured after four hours in a 23±2 °C room, because a fresh grenade transport case still shrinks. Wall is read at 10 points with an ultrasonic gauge, four of them in the corner radii. Sink marks deeper than 0.2 mm on the sealing face are promoted to major.

3. Seal and hardware performance judgement

Seal performance is judged by pressure decay, never by bubble testing. The cavity is charged to 15 kPa, held 30 seconds, then timed for 60 seconds; a decay above 0.6 kPa fails.

Latches need at least 600 N of holding force each, with no more than 50 N of difference between them. Hinges are cycled 5000 times and the grenade transport case must still pass the decay test. Screw torque is 1.2 N·m, verified on 5 samples.

ItemTest conditionDecision lineClass
Seal15 kPa charge, 60-second holdDecay at or below 0.6 kPaCritical
Latch forcePull along opening directionAt least 600 NMajor
Latch synchronismBoth paper strips pulled togetherDifference at or below 50 NMajor
Hinge life5000 cycles, then retestNo crack, decay still passesMajor

4. Drop, stacking and thermal cycling verification

Drop testing uses the harshest attitudes: one bottom face, four edges and four corners, nine drops from 1.5 m onto concrete. After each drop a grenade transport case must show no through crack, latches operable with one hand, and a passing decay test.

Stacking reproduces warehouse storage, not transport: three high with 600 kg on top for 24 hours, then permanent set within 2 mm after one hour of recovery, tested at 40 °C. Thermal cycling runs three cycles of -25 °C and 55 °C, four hours each, before latches and rim are re-checked.

5. Decision rules and nonconforming disposition

The order cannot be reversed: critical first, then major, then minor. One critical defect rejects the lot without tightened sampling. Major defects at the acceptance number mean 100% sorting or rework and resubmission; minor ones may pass by concession with the scope stated.

Resubmitted lots are sampled at 160 pieces, covering every tote that held reworked parts; a lot failing again is returned.

OutcomeTriggerDispositionRe-inspection
AcceptAll classes within AcRelease with reportNone
SortMajor class reaches ReInspect every piece160 samples
ReworkSize or hardware repairableReplace hardware or correct size160 samples
RejectOne critical defectReturn lot, no conformity declarationNot offered

Conclusion

Acceptance of a grenade transport case comes down to three habits: class the defects, fix the decision lines, order the dispositions. AQL with Ac/Re decides release, and 15 kPa decay with 600 N latch force decides whether the evidence suffices. Write those numbers into the procedure, and grenade transport case quality stops depending on impressions.

This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.