Quick answer: A Protective Case Sales quotation is a draft contract, not a price note. Of its nine clauses, three must be written in figures: the specification down to tolerance, the tooling fee down to ownership, and the lead time down to its start date and penalty.
Table of contents
- Protective Case Sales Quotation: Nine Clauses
- The Specification Clause
- The Tooling Clause: Who Pays, Who Owns
- The Lead Time Clause
- Validity and Payment
- FAQ
1. Protective Case Sales Quotation: Nine Clauses
The usual sheet is a product name, one unit price and a line saying the contract prevails. It looks clean and hides risk. A Protective Case Sales quotation stands alone: a buyer decides from it, a factory schedules from it.
| Clause | Must state | Cost of omitting |
|---|---|---|
| Item and model | model, colour, revision | wrong variant shipped |
| Specification | envelope, cavity, wall, material, tolerance | two versions at inspection |
| Tooling | amount, milestones, owner, life | tool stays with the factory |
| Price breaks | quantity bands, unit price | renegotiation on every top-up |
| Lead time | start condition, stage days | delay blamed on nobody |
| Penalty | rate, cap, exclusions | the clause is decorative |
| Validity | days, what follows expiry | old sheet used to press price |
| Payment | shares, milestones, currency | balance never collected |
| Packing | stack height, pallet, trade term | container loaded at the port |
Omitting a clause costs: a sheet without tolerances adds 6 days of back-and-forth, and one without ownership leaves the mould behind.
2. The Specification Clause
Protective Case Sales specifications fit in five lines, each with a number: the envelope at its largest outline, stating whether wheels and handle are included; the cavity measured to the wall, foam excluded; the wall at nominal thickness with tolerance; the material by grade and melt index; the weight as a band.
| Item | How to write it | Common gap |
|---|---|---|
| Envelope | 520 x 380 x 210 mm with wheels, tolerance 2 mm | wheels not mentioned |
| Cavity | 470 x 330 x 185 mm clear, foam excluded | foam taken as clear |
| Wall | 4.0 mm, plus or minus 0.25 mm | average wall only |
| Weight | 4.6 kg, plus or minus 3 percent | about 4.6 kg |
Tolerance is the first column to disappear. A 0.25 mm wall tolerance is ordinary capability; leave it out and a buyer inspecting to 0.1 mm rejects three batches in ten.
At 4.6 kg plus or minus 3 percent, anything outside 4.46 to 4.74 kg stops at the weighing station. Colour follows, capped at 1.5 DE. Three words are banned here: about, roughly, as per sample.
3. The Tooling Clause: Who Pays, Who Owns
Tooling runs 24,000 to 96,000 CNY by outline and cavity count. The sheet states the amount, milestones and build time; tooling runs 18 to 25 days outside product lead time.
| Model | Tooling fee | Owner | Unit price |
|---|---|---|---|
| Buyer buys out | paid in full | buyer | no amortisation |
| Factory holds | none, in price | factory | 22 CNY higher to 800 units |
| Mixed | 60 percent upfront | buyer, stored on site | balance over 2,000 units |
Buy-out needs a storage clause: the tool stays on site, the buyer gives 30 days notice to collect it, storage is 600 CNY a year. Without it, a buyer assumes the mould can leave any morning.
The amortised model needs an end point: after 800 units the price drops 22 CNY, and without it the buyer pays the amortised rate for years. Ownership also carries life: 300,000 shots, then a named party pays for service.
4. The Lead Time Clause
The start condition comes first: deposit received and sealed sample sheet returned on the same day, which becomes day one. Then 7 days of material, 18 of moulding with changeover and first article, 15 of assembly, 40 in all.
The penalty runs at 0.5 percent per day, capped at 8 percent, factory causes only. Buyer changes, late approvals and late payment extend the date. A harsher rate only pushes the line later.
5. Validity and Payment
Validity is 45 days: compound and hardware make up over 60 percent of cost, and 45 days is one purchasing cycle. Beyond it, expiry means re-quoting or index-linking, with moves beyond 3 percent shared.
Payment splits three ways: 30 percent deposit, 60 percent against the bill of lading copy, 10 percent fifteen days after acceptance. Tooling runs 50 percent to build, 50 on passing trials, and packing closes the list at four layers high on a 1200 x 1000 mm pallet.
Conclusion
A Protective Case Sales quotation stands on three lines: specification written to tolerance, tooling written to ownership, lead time written to its start date. The other six clauses orbit them, fixing the time boundary of the price and the instalments of the money. Write all nine and Protective Case Sales stops patching the paper afterwards.
This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.
Related Reading
- Protective Case Tooling Cost
- Case Cost Structure Breakdown
- Where Waterproof Box Price Differences Come From
- How to Choose a Case OEM Factory
Related Products
- 8 Series — Gun Cases; Military Equipment Cases; Camera Equipment Cases; Drone Cases; Watch Cases; Knife Cases; First Aid Cases; Electronics Equipment Cases
- WL8-2812 PP Gun Case — model WL8-2812
- All protective cases and toolboxes: 7 series, 158 models