Quick answer: Judge a plastic products factory on five points: clamp tonnage against projected area, mould list and changeover time, certificate scope, four record sets at audit, then sampling and a cost breakdown. A 620 x 420 mm case needs 781 tonnes of clamp force, so a plant capped at 550 tonnes cannot mould it.

Table of contents

  • Five Checks a Plastic Products Factory Must Pass
  • Check One: Tonnage Against Projected Area
  • Check Two: Mould List and Changeover
  • Check Three and Four: Certificates and the Audit Walk
  • Check Five: Sampling, Quoting and Lead Time
  • FAQ

1. Five Checks a Plastic Products Factory Must Pass

Showroom samples prove little; part fifty thousand is the real test.

Each check answers one question: tonnage sets the largest part, moulds set scheduling, certificates set which industries you reach, the audit sets whether paperwork is real.

CheckEvidenceVague answer
Tonnagemachine registerwe can make anything
Mouldsmould list, changeover logplenty of moulds
Certificatesnumber and scopewe have them all
Recordsfirst-off sheet, patrol logmanagement is solid

A plastic products factory running twelve presses from 90 to 1,000 tonnes covers bodies from 200 to 780 mm; one capped at 250 tonnes cannot hold a 620 mm tool.

2. Check One: Tonnage Against Projected Area

Bigger is not better; tonnage must match projected area. Too little clamp force flashes the part, too much wastes hours: area times cavity pressure, plus twenty percent.

Plastic products factory: black case open upright, blue lining in the lid, black foam holding a screened meter, two modules and a metal rod
Plastic products factory: black case open upright, blue lining in the lid, black foam holding a screened meter, two modules and a metal rod

A 620 x 420 mm case projects 2,604 square centimetres; at 300 kg per square centimetre it needs 781 tonnes, so a 1,000 tonne press keeps 22 percent in reserve while a 550 tonne one flashes.

A plastic products factory quoting capacity is really quoting effective hours. Two-up on a 550 tonne press at a 68 second cycle gives 2,320 parts a day over 22 hours, about 60,000 a month.

3. Check Two: Mould List and Changeover

The mould list says more about a plastic products factory than the machine list. A 620 mm tool costs CNY 80,000, and steel grade sets life: 718 for 300,000 shots, 2738 for 500,000.

PressUsable projected areaTypical body
250 t0.08 sq m320 x 250 mm
550 t0.18 sq m480 x 360 mm
1,000 t0.33 sq m620 x 420 mm

Changeover decides whether small orders are welcome. Quick-release swaps a mould in 40 minutes; bolted clamps take three hours, so three swaps a day costs seven hours of output.

4. Check Three and Four: Certificates and the Audit Walk

Read the scope, not the logo. ISO 9001 covers a quality system, not product performance; RoHS and REACH target substances and reports expire yearly; IATF 16949 matters only for automotive work.

Plastic products factory: corner close-up in white, pale grey foam cut with a round counterbore and a groove, bead texture visible along the rim
Plastic products factory: corner close-up in white, pale grey foam cut with a round counterbore and a groove, bead texture visible along the rim

An audit runs two days over 42 items and rarely starts in the filing cabinet: signed first-off sheets, patrol inspection every two hours, samples from three months back, resin bag numbers matching issue slips.

Check the test bench: a plastic products factory cycling parts from minus 20 to 60 C over 48 hours can take winter transport work.

5. Check Five: Sampling, Quoting and Lead Time

Sampling filters suppliers faster than meetings: a free sample drifts three weeks, a paid one at CNY 800 lands in seven days because the schedule has a slot.

StageTimeCostDelivered
Sampling7 daysCNY 800three parts
Tooling25 daysCNY 80,000first-off
Production20 daysper unitinspection record

Split the quote into resin, machine time, tooling and finishing. At 3.0 mm wall a 620 mm body weighs 2.6 kg, so resin costs CNY 23 at CNY 9 a kilo; a 550 tonne press at CNY 180 an hour adds CNY 4.8 a part. A lump sum hides which line carries the margin.

Lead time follows: 20 days standard colour, five more custom, 25 more for tooling. A plastic products factory that writes all three into the contract holds its schedule.

Conclusion

Run the five checks and the shortlist becomes evidence: 781 tonnes of clamp force, 718 or 2738 steel, a certificate number that resolves, four record sets whose dates agree. Choosing a plastic products factory is a matter of records, not showroom size.

This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.