Quick answer: Mounting a Large Mold starts with a level lift, eight clamps at 45 N·m and a 620 mm mold depth checked against 810 mm tie bars.

Table of contents

  • Lifting Sequence and Clamp Order When Mounting a Large Mold
  • Clamp Count and Bolt Torque
  • Depth, Width and Tie-Bar Clearance
  • Stepping Trial Pressure in Three Stages
  • First-Piece Check and Clamp-Force Audit
  • FAQ

1. Lifting Sequence and Clamp Order When Mounting a Large Mold

Mounting a large mold starts with one lift, and the order of that lift decides how the trial run goes. The crane holds the 3.2 t body at 200 mm for 30 s: a sling slipping on the feet shows up there, and a centre of gravity 20 mm off centre costs a pry bar and a chipped locating ring later.

Four lifting points, eyebolts threaded into the feet to 1.5 times the bolt diameter, so an M24 hole carries 36 mm of thread. Slings run equal in length with an included angle under 60°; every extra 15° adds a tenth to the load per leg.

Fixed half first, moving half second. The locating ring enters the platen bore with 0.05 mm clearance per side, so the body must sit within 2° of level or it will not go in.

StepActionCheck
Before the lifteyebolts at 1.5 × diameter, angle ≤60°no slack or broken wire
Trial lifthold 200 mm for 30 sno creep, no noise
Fixed half seatingring into bore, tilt ≤2°0.05 mm per side
Clampingtwo diagonal first, six afterclamp flat on the platen
Slings offonly with all eight clamps setbody does not settle

Bar the machine over by hand before the first close: ejector plate, slides and water fittings must clear.

2. Clamp Count and Bolt Torque

Mounting a large mold at 3.2 t takes eight clamps, four per half, at the corners plus the mid-point of each long side, each sitting 40 mm on the platen over a heel block of the same height. A heel 1 mm short turns the clamp into a see-saw and loads the front edge alone.

Mounting a Large Mold staging area with steel molds resting directly on the floor, guide pins up, mold boards at left, presses behind.
Mounting a Large Mold staging area with steel molds resting directly on the floor, guide pins up, mold boards at left, presses behind.

Torque is where mounting a large mold is most often hurried. The 45 N·m figure comes from the bolt: an M16 coarse thread with molybdenum disulphide reaches roughly 60 kN of preload, so eight clamps give 480 kN, about 48 t, or 7% of a 650 t clamp force. That share only has to stop the body creeping back after each shot.

Platen widthClampsBoltTorque
≤400 mm4M1225 N·m
400–600 mm6M1645 N·m
600–800 mm8M1645 N·m

Check the wrench each shift and retire it past 5% drift.

3. Depth, Width and Tie-Bar Clearance

Depth and width are checked together when mounting a large mold. At 620 mm the body sits mid-range in a 350 mm to 900 mm window, leaving 300 mm either way, but width bites first. Tie bars stand 810 mm apart, so a 760 mm mold keeps 25 mm per side, and one swing during the lift scrapes the chrome off a bar.

The diagonal is the part of mounting a large mold that gets forgotten. A body 760 mm wide and 620 mm deep measures 981 mm across the corners, wider than the 810 mm opening, so it only goes in vertically.

Where depth falls short, packers go under the feet: flat to 0.05 mm, in 5 mm steps, footprint no smaller than the foot. Stack three and the error reaches 0.1 mm, enough to tilt the body invisibly; flash then lands on the same side of the case every shot.

Turn the adjusting gear by hand afterwards, and all four corners should feel alike. With the centre of gravity 20 mm off, the two nearer tie bars carry about 10% more load, and months of that start a crack at the thread root.

4. Stepping Trial Pressure in Three Stages

Mounting a large mold never applies 650 t in one move. Stage one runs at 30% with injection cut to match, and the only question is where the melt stops. Stage two at 60% watches venting and weld lines. Stage three at 100% is where flash and dimensions count.

Mounting a Large Mold trial parts displayed on shelving, blue black and green cases open with compartmented foam and lid seals visible.
Mounting a Large Mold trial parts displayed on shelving, blue black and green cases open with compartmented foam and lid seals visible.

Low-pressure protection sits at 1.5 mm on stage one, so anything thicker inside the cavity stops the press. That is thinner than a glove and thicker than a pellet, and the item left behind is usually a sprue.

StagePressureWatchPass
One30%fill position, short shotmelt reaches 80% of cavity
Two60%venting, weld line, burnburn ≤1 mm²
Three100%flash, spring, dimensionsspring ≤0.05 mm, flash ≤0.05 mm

At 60% trapped air leaves a burn mark running from pale yellow to dark brown, and anything past 1 mm² needs a vent 0.02 mm deep and 5 mm wide, cut where flow arrives last. Stage three measures spring with a dial gauge on the moving platen: no more than 0.05 mm at 650 t, 10 shots per stage at a 25 s cycle.

5. First-Piece Check and Clamp-Force Audit

For mounting a large mold, five parts decide more than any report. Take them consecutive, shot one through five, unpolished and unselected.

Once mounting a large mold yields parts, weight is the fastest verdict. Five parts from one run should sit within 1.5% of each other; at 3% the fill is unstable, so return to stage two instead of touching hold pressure. Measure wall thickness at three points on the case, where a 2.5 mm to 3.5 mm design range is met mid-band.

Clamp force is audited on spring and on the print at the parting line. An even contact print, with a 0.02 mm feeler refusing to enter, means the force is spread; one wide patch means that clamp has gone soft.

Write the eight torque values, three stage pressures and five weights onto the mold card, which saves four shots next time. As protective case bodies grow, mounting a large mold leaves few records beyond it.