Quick answer: A Military Supply Transport Case quote is six cost buckets, an MOQ set by cavity count and purge loss, and a lead time that is five milestones in series. Split the quote, fix the tiers, and put milestones and limits in the contract.

Table of contents

  • What a Military Supply Transport Case Quote Should Break Down
  • MOQ and Volume Tiers
  • Lead Time Milestones for a Military Supply Transport Case
  • Incoming Inspection Clauses
  • Three Add-On Charges and How to Avoid Them
  • FAQ

1. What a Military Supply Transport Case Quote Should Break Down

Most Military Supply Transport Case quotes arrive as one number, with six cost buckets behind it and a surcharge for every vague one.

BucketBasisCNYNegotiation
ToolingMould ÷ quantity9 to 36Small
ResinWeight × 1.06 × price48 to 62Regrind ratio
MouldingTonnage × cycle42 to 68Cavity count
HardwareLatches, hinges, valve30 to 55Brand, alloy
FoamDensity × volume25 to 45Cutting method
PackingCarton, pallet, testing12 to 20Batch size

Net weight is the one anchor a buyer can check. A 600 × 400 × 320 mm body weighs 4.2 kg, so resin at 11.5 CNY per kilogram and 1.06 scrap costs about 51 CNY. A quote showing 95 CNY there hides regrind or hardware.

Tooling is either amortised at 9 to 36 CNY per unit or bought outright for 18,000 CNY.

2. MOQ and Volume Tiers

MOQ for a Military Supply Transport Case follows cavity count and colour-change purging. A single-cavity tool wastes about 40 units per colour change, and at a 110 second cycle the press needs eight hours to absorb it, hence the 300 unit line.

QuantityIndexCNYDelivery
100 to 299100412Stock colours
300 to 49992379Seven days
500 to 99985350One-colour print
1,000 and above79325Print and pallet

Three clauses give a tier table meaning: fixed boundaries, no retroactivity, and an index-linked price. A 500 unit order is not invoiced at the 1,000 unit rate. Custom masterbatch starts at 500 units, and a print plate costs 800 CNY per colour.

3. Lead Time Milestones for a Military Supply Transport Case

A 45 day promise treated as one date starts disputes. Break the Military Supply Transport Case schedule into 28 days for tooling, 5 for first-article approval, 18 for production, 2 for inspection and 3 to 7 for freight. Penalties belong on milestones.

MilestoneDeliverableLate penalty
ToolingFirst shot0.2 percent per day
First articleSigned sampleBuyer replies in five days
Production500 unitsSplit runs notified
InspectionVerdict sheetBatch reworked

Capacity is counted in presses, not floor area. A 1200 tonne machine at 110 seconds and 20 effective hours a day makes about 650 units daily, and September to November books run three weeks out, adding 15 days.

4. Incoming Inspection Clauses

An inspection clause needs a sampling plan, acceptance limits, and an owner of the reject right. On 500 units, draw 20, accepting appearance at AQL 2.5 and critical items at AQL 1.0.

ItemMethodLimitDisposition
AppearanceD65 plus colorimeterShift within 1.5Double the sample
WallUltrasonic, eight points3.2 mm ± 0.2 mmQuarantine
LatchTensile gaugeNot below 350 NInspect all
Sealing15 kPa, hold 60 secondsDrop within 1.5 kPaFull check or return
Foam fitFeeler gaugeGap within 1.0 mmRework

First articles are approved at the plant, production samples on arrival; neither replaces the other. Two units per batch go to the drop test at 3 CNY each.

5. Three Add-On Charges and How to Avoid Them

Tooling changes are billed by the hour once the drawing is frozen, 3,000 to 8,000 CNY each, so the contract should include one free modification.

Small reorders below MOQ carry 1.3 times the unit rate or a 1,200 CNY start fee, so a framework should hold two fee-free reorders a year.

Testing comes third: salt spray for 48 hours, a minus 30 degrees soak, or a third-party report, 800 to 2,500 CNY per batch. Price it up front, and state whether the 13 percent VAT is included.

Conclusion

Price, MOQ and lead time are three views of one decision. An open quote shows which bucket a discount comes from; a milestone schedule shows where a delay lands; written limits show why the cheap batch was cheap. A Military Supply Transport Case quote with consistent definitions is what makes that comparison real.

This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.