Quick answer: A Tool Roll quotation splits into fabric, trims, sewing hours, packing, overhead and tax. The 300-piece tier lands near 42 CNY a unit and the 3000-piece tier near 34. The 34-day lead time is 12 days of fabric, 3 of cutting, 15 of sewing and 4 of packing.

Table of contents

  • How a Tool Roll Quotation Is Costed
  • Minimum Order Quantity and Small Lots
  • Tier Pricing and Sample Fees
  • Lead Time from Fabric to Loading
  • Contract Terms on Payment, Inspection and Changes
  • FAQ

1. How a Tool Roll Quotation Is Costed

A single price leaves nothing to negotiate. Split the Tool Roll quotation into fabric, trims, sewing hours, packing, overhead and tax, and the structure becomes visible.

A 1.5 m wide 16 oz coated canvas uses 0.62 m per twelve-slot roll with 8% cutting loss, so at 26 CNY a metre the fabric alone costs about 16 CNY, near 40% of the price.

Cost itemSharePer unit at 300 pcsRoom to cut
Fabric39%16.4 CNYSmall, follows grey goods
Trims13%5.4 CNYMedium, change buckle
Sewing hours24%10.1 CNYLarge, change routing
Packing6%2.5 CNYMedium, change carton
Overhead8%3.4 CNYSmall
Profit and tax10%4.2 CNYNegotiable

Sewing is the item buyers underestimate: 46 stitch lines and 22 minutes of net sewing per piece, which is 13 CNY at 28 CNY an hour against the 10.1 CNY quoted.

2. Minimum Order Quantity and Small Lots

MOQs follow material minimums. Fabric starts at 500 m, enough for 800 pieces; woven labels start at 5000 and custom buckles need 3000; labels are the hardest to trim.

Tool Roll: stacks of kraft cartons on a packing bench, a woman closing lids, open cartons and film-wrapped cases behind her
Tool Roll: stacks of kraft cartons on a packing bench, a woman closing lids, open cartons and film-wrapped cases behind her

Small lots cost more because of leftover material. Stock colours allow 100 pieces at plus 15%, while a specified shade means buying the whole roll and spreading 12 CNY a metre of surplus into the price.

Three hundred pieces at 42 CNY is 12,600 CNY of goods against a 13,000 CNY roll of fabric, so small buyers accept stock colours, pay the premium, or wait for a shared run.

QuantityUnit priceFabric sourceSample feeLead time
100 to 29948.3 CNYStock colour800 CNY22 days
300 to 99942.0 CNYDyed to order800 CNY credited34 days
1000 to 299937.5 CNYDyed to orderWaived38 days
3000 and up34.2 CNYDyed in lotsWaived45 days

3. Tier Pricing and Sample Fees

Tier pricing is not linear. The step from 300 to 1000 pieces drops 4.5 CNY out of hourly amortisation and cutting yield, the step to 3000 drops 3.3 CNY.

The 800 CNY sample fee buys one confirmation sample and one revision, credited in full at 500 pieces and half below that; later revisions cost 300 CNY each.

Quotations hold for 30 days because polyester grey goods can move 6% in a month; the price locks to the signing-date index.

4. Lead Time from Fabric to Loading

Thirty-four days is 12 days dyeing, 3 cutting, 15 sewing and 4 inspection and packing, with no buffer between them, so a slip in any stage lands on the ship date.

Tool Roll: a worker lifting the red lid of a case, black parts trays and bagged fittings on the bench, stacked cases behind
Tool Roll: a worker lifting the red lid of a case, black parts trays and bagged fittings on the bench, stacked cases behind

Two stages compress: stock fabric saves 7 days and a second two-shift team saves 5, reaching 22, while cutting waits for fabric.

A twelve-slot roll packs to 0.008 cubic metres, so a 40HQ takes 9000 pieces and a 20GP takes 4200. A 3000-piece order needs consolidation, adding 7 to 10 days.

5. Contract Terms on Payment, Inspection and Changes

Payment runs 30/70: a 30% deposit releases material and the balance follows the bill of lading copy. Below 20% no fabric is reserved, above 50% the buyer finances the run.

Inspection happens twice: a mid-run check at 30% of sewing, and a final sample at AQL 4.0 against the lot-size table, with rework and re-inspection at the factory's cost.

Changes cover quantity, colour and date. Movements within 10% keep the price, colour is free before dyeing, and expediting carries a stated premium, usually 8%.

Conclusion

Tool Roll procurement comes down to three tables: the cost breakdown, the tier table and the lead-time split. Get those, fix payment, inspection and change terms in writing, and price and schedule stop being someone else's promise. The saving that matters is the rework and delay that never happen on a Tool Roll order.

This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.

Related Reading

Related Products