Quick answer: A Weapons Consolidated Tool Kit quote has five processing blocks plus overhead. One steel mould runs about 238 000, the minimum is 200 units, tooling still holds 47 percent at 1000 units, and a 200-unit order takes about 47 days.

Table of contents

  • What a Weapons Consolidated Tool Kit RFQ Must Specify
  • What the Quote Is Built From
  • MOQ and the Tooling Break-Even
  • Five Stages Behind the Lead Time
  • Acceptance Points and Payment Milestones
  • FAQ

1. What a Weapons Consolidated Tool Kit RFQ Must Specify

Six fields carry the price: cavity size, wall thickness with a weight ceiling, hardware list, insert layout, acceptance values and annual volume.

A 560 by 360 by 190 mm cavity, a 3.2 mm wall and a 5.8 kg ceiling fix the mould and the shot. Inflate to 30 kPa, hold 90 seconds, cap the drop at 1.5 kPa; two suppliers then price inspection alike.

Hardware is the field most often missing: four latches, two hinges, one valve, one handle set. Zinc alloy latches save 21 per case but cut open-close life from 500 cycles to 300. Three EVA layers at 60 kg per cubic metre give assembly a basis.

2. What the Quote Is Built From

Five processing blocks of a Weapons Consolidated Tool Kit quote plus overhead: material, moulding, hardware, insert and assembly, inspection and packing. At 200 units material and hardware are 51 percent.

Weapons Consolidated Tool Kit: a red case open on a timber bench, black foam cut-outs empty inside, wrenches and sockets laid out to the right
Weapons Consolidated Tool Kit: a red case open on a timber bench, black foam cut-outs empty inside, wrenches and sockets laid out to the right
Cost blockPrice at 200 unitsBasis
Material825.8 kg PP, 8 percent regrind
Injection moulding31110-second cycle, 620 per hour
Hardware744 latches, 2 hinges, 1 valve
Insert and assembly68Three EVA layers, 22 minutes
Inspection and packing243 leak tests per batch
Overhead and margin269.3 percent of the five

Material: 5.8 kg at 14.1 a kilo is 82. Moulding: a 110-second cycle at 620 an hour is 18.9 a shot plus 12 for trimming.

Inspection is separate: two drop units cost 900, or 4.5 per case across 200.

3. MOQ and the Tooling Break-Even

The 200-unit minimum is changeover economics: 90 minutes to change the mould, 120 to set the press, 30 for the first shot, a fixed 4 600 that is 23 per case at 200 units and 46 at 100.

BatchTooling per unitProcessingUnit price
20011903051495
500476288764
1000238274512
2000119261380

Break-even sits near 1000 units: tooling is 80 percent of the price at 200, 47 at 1000, 31 at 2000, and the last doubling recovers 26 percent.

Tooling is amortised once, so a 200-unit repeat is 305 with no mould inside it; leave the clause out and year two carries another 1190.

4. Five Stages Behind the Lead Time

Lead time for a Weapons Consolidated Tool Kit order breaks into drawing and hardware sign-off, mould build, first article, production and inspection.

Weapons Consolidated Tool Kit: a red case open on a workshop floor, tools set in foam, an angle grinder cabled in front, welding sparks behind
Weapons Consolidated Tool Kit: a red case open on a workshop floor, tools set in foam, an angle grinder cabled in front, welding sparks behind
StageDaysKey actionsTypical slip
Drawing and hardware5Colour sample, latch sign-offHardware change, 4
Mould build2214 roughing, 6 finishing, 2 trial shotsShrinkage, 3
First article43 samples, 12-point wall checkInsert rework, 2
Production12200 units, two shifts, 20 a dayPress queue, 3
Inspection43 leak tests, 2 drop testsSurveyor, 2

The five stages total 47 days at 200 units and 53 at 500, with production at 18 days; twenty a day over two windows covers 200 in 10 days.

Only mould build and production compress: two-shift roughing saves 5 days for 19 000 extra; rush production is 3 200 a press day.

5. Acceptance Points and Payment Milestones

Acceptance is written as pass or fail lines: AQL 0.65 visuals, 12 wall points within 0.35 mm, the closed Weapons Consolidated Tool Kit inflated to 30 kPa and held 90 seconds under 1.5 kPa, two units dropped from 1.2 m, latches through 500 cycles.

Payment is 40 percent before the mould opens, 30 on first-article approval, 25 before shipment and 5 retained 90 days. Mould life is 300 000 shots, the mould belongs to the buyer, latches ship as 2 percent spares.

Conclusion

Procurement is four definitions rather than one price: the hardware list, the tooling base, lead time by stage and acceptance values you can measure. Fix mould ownership and repeats, and year three stops climbing. A buyer who reads the amortisation curve gets a better Weapons Consolidated Tool Kit price.

This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.