Quick answer: A case factory audit checks three blocks: 8 machines or more at 250 t to 1300 t, 60 mould sets with care cards, and calibrated instruments.
Table of contents
- Machines: nameplate first, screen second
- Moulds: pull one out and read its care card
- Test room: range, accuracy, calibration
- Running 42 checks in six hours
- Grading failures and the re-audit interval
- FAQ
1. Machines: nameplate first, screen second
Two things on a moulding floor are hard to fake: the clamping force on the nameplate and the shot running on the screen. A plant building 20 L to 120 L cases should hold 8 machines or more, spanning 250 t to 1300 t. Below that, peak-season work goes out of the gate. Once a mould leaves the building, the process settings leave with it. A case mould is heavy, so a cross-plant move means two lifts. Every lift raises the chance of a cavity knock.
Photograph the nameplate, then photograph the screen. A machine rated 800 t running at 520 t is making room for another product, and the case mould queues behind it. Note three readings while the screen is open: barrel temperature, holding pressure, cycle time. Any disagreement with the process sheet needs an answer before you walk on.
Shifts count as much as tonnage. Two shifts across 22 days gives 44 shifts a month; a single-shift plant has half the capacity its machine count suggests.
| Equipment | Key parameter | What you do on site |
|---|---|---|
| Moulding machine | 8 or more, 250 t to 1300 t | Photograph nameplates, count machines, map tonnage |
| Mould heater | Control within ±2 °C | Compare set point with actual, feel the return line |
| Chiller | Outlet at 12 °C | Read the panel, check for condensation |
| Air-tightness bench | 0 to 100 kPa, ±0.5% FS | Test one case yourself, watch the decay curve |
| Drop rig | 0 to 2 m, 9 kg head | Measure the height scale, inspect the rails |
| Tensile rig | 0 to 5 kN | Pull one latch, read the peak |
Auxiliary units get dropped from most lists, yet they decide consistency: ±2 °C on the mould heater keeps warpage away, and 12 °C on the chiller steadies cycle time. Ten minutes with two panels settles both.
2. Moulds: pull one out and read its care card
Moulds are the real asset and the easiest item to inflate. Sixty sets is the floor for this range; below that, most sizes lean on outside tooling and the lead time sits in someone else's hands.
Pick one mould in production and ask for its care card. A usable card records cleaning, ejector lubrication and water-circuit descaling every 5000 shots, with initials and dates. Then pull 3 idle moulds and match four fields against the log: number, cavity count, steel grade, last service shot.
| Check | Pass line | What good looks like | If it fails |
|---|---|---|---|
| Mould count | 60 sets or more, traceable | Racked by number with a size label | Grade B, log in 30 days |
| Care records | One entry per 5000 shots, signed | Card on the mould, dates unbroken | Grade A, 7 days, re-verify |
| Storage | 100 mm off the floor, oiled, ≤60% RH | Pallets under racks, bright cavities | Grade B, fix by deadline |
| Remaining life | Under 70% of rated shots | Cumulative count lets you sum it | Grade A, new tool plan |
| Lifting and marking | Weight marked, eyes intact | Label and eyes on the side | Grade C, before re-audit |
The log usually breaks at remaining life. A steel tool rated 300,000 shots needs cavity polishing near 240,000, so in use without a count tells you nothing.
Storage is the slowest item and the most revealing. Racks 100 mm off the floor, oiled cavities and humidity under 60% keep a mould usable for six months. Skip one of the three and the parting line rusts, and a single polish takes 0.02 mm off the fit.
3. Test room: range, accuracy, calibration
The test room is the section auditors skip and the one that shows capability. Bench, drop rig and tensile rig in house mean sealing and impact get judged on site; lose one and type testing goes out, stretching from 3 days to 15.
Read the bench on two numbers. A 0 to 100 kPa range covers the 0.3 bar to 0.5 bar used on cases, and ±0.5% FS caps the error at 0.5 kPa. A bench rated ±2% cannot resolve a 2 kPa decay limit at all.
On the drop rig, travel and rails both matter. A 0 to 2 m stroke covers the usual 1.5 m drop, but a bent rail shifts the impact point 10 mm or more and the head lands on a face instead of a corner. A 0 to 5 kN rig needs grips that hold a latch pull without slipping.
Calibration labels are the identity papers of all three. Calipers, bench and rig run on a 12-month cycle, and a label one day out voids the report. Have the inspector test one case from clamping to reading while you watch.
4. Running 42 checks in six hours
Forty-two items fit into 6 h if the time is blocked. Give 3 h to the floor, one hour each for machines, auxiliaries and mould racks; take 1.5 h in the test room; spend the last 1.5 h on documents.
Do not spread effort evenly. Nine of the 42 items, 21% of the list, touch sealing and strength, and those decide whether the case works at all; most of the remaining 33 are paperwork that can be photographed on the walk.
Every item needs a photo behind it, 42 for 42, numbered to match and timestamped. When time runs short, take the floor first: machines are hard facts, documents can follow.
5. Grading failures and the re-audit interval
Grade results A, B or C instead of scoring them. Grade A covers sealing, latches, wall thickness and mould life, with 7 days to correct and a re-check after. Grade B covers appearance, marking and storage at 30 days. Grade C covers missing documents.
Three Grade A findings among the 42 end the audit without anyone totalling points. A file with only B and C findings can supply while correcting.
Re-audit at 12 months, or 3 months if a batch defect rate passes 1.5%, moulds move site, or the workshop relocates. Machines walk.
Conclusion
The value of a case factory audit is not the item count but whether three blocks can be verified on the spot: 8 machines spanning 250 t to 1300 t, 60 mould sets with signed care cards every 5000 shots, and a test room reading 0 to 100 kPa, 0 to 2 m and 0 to 5 kN under 12-month labels. Run the 42 items in 6 h, grade A, B and C, stop at 3 Grade A findings, and re-audit at 12 months. The report then describes what the floor holds.
This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.
Related Reading
- Supplier audit: the eight points to check on site
- Clamping tonnage and monthly output, converted
- Mould storage: rust prevention, lifting and logs
- Designing a supplier scorecard
Related Products
- 8 Series — Gun Cases; Military Equipment Cases; Camera Equipment Cases; Drone Cases; Watch Cases; Knife Cases; First Aid Cases; Electronics Equipment Cases
- WL8-2812 PP Gun Case — model WL8-2812
- All protective cases and toolboxes: 7 series, 158 models