Quick answer: An Equipment Case price is four blocks: mould and jigs, moulding, foam cutting, panel hardware. Itemise the mould, order above the amortisation break-even, and split lead time into tooling, trials and production before comparing quotes.
Table of contents
- What an Equipment Case Quote Is Made Of
- Where Mould Cost Amortisation Breaks Even
- Lead Time in Three Separate Blocks
- What an RFQ Must State
- Who Owns Sampling and Who Owns Production
- FAQ
1. What an Equipment Case Quote Is Made Of
An Equipment Case price is four blocks stacked. Mould and jigs are one-off, and itemising them decides whether two quotes compare. Moulding locks material, tonnage and cycle: a 600×400×230 mm shell runs 96 s on an 800 tonne press and 74 s on a 500 tonne one. Foam is priced by cutting time, 18 minutes per six-compartment set. Panel work is small and easiest to omit.
| Cost block | Priced by | Typical figure | What moves it |
|---|---|---|---|
| Mould and jigs | one-off, per tool | CNY 42,000 | cavities, sliders, steel grade |
| Moulding | material plus machine time | CNY 96 per case | wall, tonnage, cycle |
| Foam insert | per set, cutting time | CNY 58 per set | compartments, hardness, nesting |
| Panel and hardware | per part | CNY 21 per case | cut-outs, gasket, latch brand |
Foam is also where price gets cut: nesting two sets on one sheet saves fifteen percent but leaves a 0.5 mm deviation in the compartment wall.
2. Where Mould Cost Amortisation Breaks Even
A CNY 42,000 tool usually carries a 300 piece minimum, so the first order returns the steel. Spread over quantity, CNY 140 a case at 300 pieces, 84 at 500, 42 at 1,000, 21 at 2,000.
| Order size | Mould share | Build cost | Landed price | Share of price |
|---|---|---|---|---|
| 300 | CNY 140 | CNY 175 | CNY 315 | 44% |
| 500 | CNY 84 | CNY 175 | CNY 259 | 32% |
| 1,000 | CNY 42 | CNY 175 | CNY 217 | 19% |
| 2,000 | CNY 21 | CNY 175 | CNY 196 | 11% |
Break-even sits where the mould falls under a third of the price, here 500 pieces. A shared frame cuts the second tool to CNY 26,000; inserts fitted after moulding start at 20 sets.
3. Lead Time in Three Separate Blocks
A 35 day promise is 18 days of tooling, 7 of trials, 10 of production.
| Stage | Days | Constraint |
|---|---|---|
| Tool design | 6 | parting line, ejection |
| Steel and standard parts | 5 | frame, sliders |
| Machining and fitting | 7 | cavity polish |
| Trials and changes | 7 | sink, flash, oversize |
| Scheduling and moulding | 10 | large press slot |
Five hundred shells at 96 s over 22 hours is under a day of moulding; the press slot and hardware matching take the rest. Foam at 18 minutes a set is six days on one cutter, so parallel work holds the block at 10 days. Steel stops shipping two weeks before Chinese New Year: contract its arrival date.
4. What an RFQ Must State
Most of the spread between Equipment Case quotes comes from an incomplete RFQ, not an inflated supplier. Eight fields close it.
- internal length, width and depth, per-side tolerance
- wall thickness, rib thickness, draft angle
- colour reference with a ΔE 1.5 limit
- ingress rating and its test, such as IP67 at 1 m for 30 minutes
- foam grade, hardness, compartment drawing, single-set cutting
- latch type, count, holding force, here 520 N each
- panel cut-out drawing, print content, gasket material
- sampling plan and treatment of a rejected lot
Sampling is skipped most often: eight pieces per lot, key dimensions gauged, appearance at AQL 2.5. Tool ownership belongs in the same document, with a CNY 2,000 removal fee.
5. Who Owns Sampling and Who Owns Production
Five T1 samples at CNY 3,000, credited against the bulk order, with a change list due within three working days, settle who pays for rework later.
- five T1 samples: supplier, drawing and appearance, credited later
- sample sign-off: buyer, signed sample and report
- change list: buyer, within 3 working days, silence is acceptance
- first-off retention: supplier, 3 per lot, 12 months, inside the price
Production splits by origin: oversize with the supplier if the tolerance was fair; a mismatched compartment depends on who drew the layout; colour beyond ΔE 1.5 is the supplier's to re-run.
Conclusion
Read an Equipment Case quote as three ledgers: one-off cost, unit build, and the labour around moulding. Quantity matters because it pushes mould recovery under a third of the price. Put both on the RFQ and the Equipment Case purchase stops being a guess.
This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.
Related Reading
- How to choose an equipment case from the item type backwards
- How to choose wholesale case supply and MOQ
- How to answer an incoming equipment case inquiry
- What small batch case customisation really costs
Related Products