Quick answer: A military box price stacks six blocks: resin, moulding, hardware, insert, testing, packing and freight. Quantity decides whether tooling is absorbed; lead time runs on three clocks.
Table of contents
- What a Military Box Quote Is Made Of
- How to Negotiate Military Box MOQ
- Lead Time Splits Into Three Milestones
- Samples and Tooling Cost in the Unit Price
- Four Clauses Every Contract Needs
- FAQ
1. What a Military Box Quote Is Made Of
Most quotes arrive as one number. Six blocks make comparison possible.
| Cost block | Basis | Typical share | Evidence |
|---|---|---|---|
| Resin | Net weight plus 8% scrap | 35–45% | Grade and batch record |
| Moulding | Machine hours or piece | 20–28% | Tonnage and cycle time |
| Hardware | Latches, hinges, valve per set | 8–12% | Salt spray report |
| Insert | Foam volume plus die cost | 10–15% | Density and cutting method |
| Testing | Per test item | 3–6% | Report number |
| Packing and freight | Pallets and distance | 6–10% | Units per pallet |
Resin and insert blur most often. Priced on net weight, wall tolerance turns into money: a case specified at 4 mm that moulds at 4.6 mm gains about 15% in weight and the quote rises with it. Ask for gross weight, net weight, measured wall thickness and the nesting drawing.
2. How to Negotiate Military Box MOQ
The minimum order is where tooling amortisation, resin pack size and changeover time cross.
| Quantity | Tooling | Unit price | Route |
|---|---|---|---|
| Under 50 | Full, about CNY 12,000 | 1.8–2.2x | Prototype |
| 50–300 | Half amortised | 1.3–1.6x | Single cavity |
| 300–1,000 | Fully amortised | Baseline | Standard run |
| Above 1,000 | Waived | 0.85–0.95x | Dedicated line |
Half the short-run premium is changeover: 3 to 4 hours to swap and dial in a mould, about CNY 700 at CNY 200 per hour, or CNY 14 a unit across 50 pieces. The harder wall is resin: 25 kg bags, and a 500 kg minimum on custom colour. Fix annual volume first, then split deliveries.
3. Lead Time Splits Into Three Milestones
Three clocks run in sequence; a slip on any one pushes the order. A new mould takes 18 to 25 days, an insert die adds 5 to 7, a colour change on an existing mould takes 2. Material follows, with standard polyethylene in 7 days against 12 to 15 for custom masterbatch, then 4 days of moulding, 2 of assembly and inspection, 1 of packing.
A 300-unit order on a new mould lands at 38 to 45 days; a repeat on an existing mould reaches 18 to 22. A supplier promising 15 days on a new tool is hiding the tooling clock. Name each start point, from drawing approval to sample sign-off.
4. Samples and Tooling Cost in the Unit Price
Sampling touches cost and drawing ownership at once. A first sample costs CNY 600 to 900 per piece, credited against the first invoice once the order reaches 300 units. Tooling differs: CNY 12,000 refundable at 3,000 units turns a one-off into a long attachment, so pay once and hold ownership.
Pin three things on the approval sheet: colour judged by chip code or physical master, where wall thickness is measured, and insert cavity clearance, normally 0.5 to 1 mm.
5. Four Clauses Every Contract Needs
Wording decides who pays when something goes wrong; these four are most often missing from a military box contract.
| Clause | Write | Without it |
|---|---|---|
| Acceptance | Itemised appearance, dimension, sealing, drop | No pass or fail call |
| Tolerance | Outer plus or minus 2 mm, wall plus or minus 0.3 mm | Batches will not stack |
| Packing | 12 per pallet, film and corner guards | Scuffs become an argument |
| Delay | Daily damages capped at 5% of value | Chasing stays verbal |
Write the methods concretely. Sealing follows the spray duration tied to the rating claimed; drop testing uses corner, edge and face once each. Tolerance is the quiet one: widening it from 2 mm to 4 mm makes a three-high stack visibly step out of line.
Conclusion
Quote, minimum order and lead time are three faces of one cost structure, negotiable only once separated. Resin and insert set the price level, tooling explains the short-run premium, and named start points decide whether a date holds. Check the military box sheet line by line before you haggle.
This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.
Related Reading
- What a military box is: classes and structure
- How to choose a military box
- Reply guide for case enquiries
- How to audit a case supplier
Related Products
- 8 Series — Gun Cases; Military Equipment Cases; Camera Equipment Cases; Drone Cases; Watch Cases; Knife Cases; First Aid Cases; Electronics Equipment Cases
- WL8-2812 PP Gun Case — model WL8-2812
- All protective cases and toolboxes: 7 series, 158 models