Quick answer: A Robot Equipment Case Manufacturer is judged on four press lines and a 62-second, two-cavity cycle at 3.5 mm walls, with one tool spread over 500 units.
Table of contents
- Four Lines Inside a Case Plant
- Two Cavities and a 210k Tool
- 500 Units, 30 Days, One Formula
- 3.5 mm Walls at a 62-Second Cycle
- Three Registers an Audit Wants
- FAQ
Capacity at a Robot Equipment Case Manufacturer shows in a 62-second two-cavity cycle, not in a machine count. Two plants can both claim 62 seconds and part by 30 percent a day once cooling water drifts 2 C.
1. Four Lines Inside a Case Plant
Four presses carry the work: 550, 800, 1,300 and 2,000 tonnes. A Robot Equipment Case Manufacturer splits them by projected area, since area sets clamp force and clamp force sets cavity count.
At a Robot Equipment Case Manufacturer a base gathers its area at the bottom and needs one clamp step more than its litre rating suggests; a lid is shallow and runs one press size down.
| Line | Clamp force | Volume served | Cavities | Cycle |
|---|---|---|---|---|
| One | 550 t | 8 to 12 litres | four | 38 s |
| Two | 800 t | 30 to 50 litres | two | 48 s |
| Three | 1,300 t | 80 to 120 litres | two | 62 s |
| Four | 2,000 t | 150 to 220 litres | one | 90 s |
Sixty-two seconds with two cavities is 116 shells an hour, near 2,000 a day at 22 hours and 80 percent utilisation; the small line clears 6,000 at 38 seconds but takes nothing above 12 litres.
Changeover sets the order book: 1.5 hours lets the small line swap three times a day, 4.5 hours on the largest line costs half a shift.
2. Two Cavities and a 210k Tool
A two-cavity tool for the 1,300-tonne press quotes at 210,000 CNY: 90,000 for cavity and core, 32,000 for the frame, 30,000 for the hot runner, 24,000 for water and ejection, 34,000 for trials and revisions.
| Order size | Tool per shell | Trials and revisions | Tooling per shell |
|---|---|---|---|
| 500 units | 420 CNY | 68 CNY | 488 CNY |
| 1,000 units | 210 CNY | 34 CNY | 244 CNY |
| 2,000 units | 105 CNY | 17 CNY | 122 CNY |
At 500 units the tool is 420 CNY a shell, close to the resin and moulding cost. That is the minimum order at a Robot Equipment Case Manufacturer: below 500 the tool dominates the quote, above 500 amortisation falls under 200 CNY.
Four cavities would need a 2,000-tonne press for volume that rarely exists; a two-cavity tool scraps half a shot instead of all of it.
Tool life is 300,000 shots, or 600,000 shells; a rebuild then runs about 12 percent of the tool price.
3. 500 Units, 30 Days, One Formula
Five hundred is not a capacity limit. The 1,300-tonne line makes 116 shells an hour, so 500 is four hours of running. The limit at a Robot Equipment Case Manufacturer is changeover and first article: 3 hours to swap, 40 minutes to purge, one air test, then the buyer's sign-off.
Only 2 of the 30 days are moulding:
| Step | Days | Resource held | Room to move |
|---|---|---|---|
| Scheduling queue | 5 days | press and tool slot | 2 days |
| Moulding | 2 days | line three or four | 1 day |
| Foam cutting and bonding | 4 days | CNC table | 2 days |
| Sealing and assembly | 5 days | assembly bays | 3 days |
| Final test and sample seal | 3 days | air rig | none |
| Packing and freight | 7 days | cartons and trucks | 4 days |
| Buffer | 4 days | standby hours | rework |
The seven steps add to 30 days. The buffer is the first thing buyers cut, and a failed seal then pushes the order to 36 days.
Foam is under-rated: one cutting table turns out 60 to 80 sets a day, so 500 sets take 7 days. The minimum also carries about 24,000 CNY of fixed cost, or 48 CNY a shell at 500 units.
4. 3.5 mm Walls at a 62-Second Cycle
At a Robot Equipment Case Manufacturer, 3.5 mm is the working wall for 80 to 120 litre shells. Under 3 mm the side bows at 180 kg of stacking load; over 4 mm cooling climbs with the square of thickness and 62 seconds stops holding.
Cooling time tracks the square of wall thickness. A 3.5 mm PP part at 40 C mould, 220 C melt and 90 C ejection cools in 27 to 30 seconds, near half the cycle; at 4 mm it needs 39 seconds and the cycle passes 72.
The 62 seconds break down as:
- clamp 2 s
- injection 4 s
- packing 6 s
- cooling 30 s
- mould open 3 s
- demould and air blast 5 s
- robot reset and next-shot prep 12 s
Of the 32 s outside cooling the robot holds 17: an arc path and an in-mould blast return 4 s, while cooling does not move unless the wall does.
For a Robot Equipment Case Manufacturer, 3 mm cooling falls to 22 s and the cycle to 52 s, but stiffness falls with the cube of thickness: three-high stacking bows the side and seal hold drops from 60 s to 20 s. Wall tolerance is plus or minus 0.2 mm, and a 3.5 mm wall carries a 6 mm rib at 1.8 mm, about 51 percent.
5. Three Registers an Audit Wants
Skip the showroom and ask a Robot Equipment Case Manufacturer for three registers. The tool ledger carries number, cavities, shot total and revisions, and must match the press stamp.
The batch record carries resin lot, shot range, part weight, shift and press. A part-weight spread above 0.3 percent across one cavity means packing or mould temperature is drifting.
The test record carries air, immersion, stacking and drop, each with date, sample ID and verdict; conclusions without raw data are not a record.
Then time three shots beside the press: eight seconds over the 62 in the ledger means scaled water lines or a waiting robot.
Conclusion
A Robot Equipment Case Manufacturer is held by four numbers: 62 seconds, 3.5 mm, 210,000 CNY and 500 units. Hold 62 seconds and one line ships 2,000 shells a day; spread the tool over 1,000 units and tooling falls to 210 CNY.
Related Reading
- Factory audit for presses and molds
- Usable cavity and corner loss
- Foam inserts against dividers
- Hinge fatigue life
JUNZHIJIA
Related Products
- 8 Series — Gun Cases; Military Equipment Cases; Camera Equipment Cases; Drone Cases; Watch Cases; Knife Cases; First Aid Cases; Electronics Equipment Cases
- WL8-2812 PP Gun Case — model WL8-2812
- All protective cases and toolboxes: 7 series, 158 models