Quick answer: A War Reserve Case acceptance standard is worth only what a second inspector can reproduce, so every limit carries a test condition, not an adjective.

Table of contents

  • Which Metrics a War Reserve Case Standard Must Fix
  • From Storage Life Target to Accelerated Test
  • Judging Internal Humidity and Pressure Drop
  • Cycling, Stacking and Drop Conditions
  • Marking Durability and Inspection Frequency
  • FAQ

1. Which Metrics a War Reserve Case Standard Must Fix

An acceptance standard is not a list of adjectives. Write that the seal is good and two laboratories reach two verdicts; write charge to 15 kPa, hold ten minutes, lose no more than 0.8 kPa. A War Reserve Case is judged on seven groups, each with its condition.

MetricTargetConditionJudged
Storage life60, 120 or 180 monthsaccelerated runreport front page
Internal RH30 percent at five years30 days, 40 °C, 93 percent RHwithin 2 hours of opening
Pressure drop0.8 kPa maximum15 kPa charge, 10 minute hold100 L baseline
Stacking set3.0 mm maximum600 kg, 72 hours, 40 °Cone hour after unloading
Climate cyclingno cracking, 20 cycles55 °C against minus 25 °Cpressure re-test after
Markingcolour shift 3 maximum300 hours UVplus 500 abrasion strokes
Corner dropstill airtight6 hours at minus 18 °C, 1.1 mall three samples

2. From Storage Life Target to Accelerated Test

Storage life cannot be measured before delivery, so temperature does the work. On the rule that reaction rate doubles per 10 °C, 140 days at 60 °C stands in for five years at 23 °C, and 70 days at 70 °C does the same; a ten-year target runs it twice.

Acceleration is honest for compression set and desiccant saturation only. Shell creep changes mechanism by 70 °C, so a War Reserve Case stack stays a 72-hour physical test. Three samples per batch, two passing and one over fails the batch.

3. Judging Internal Humidity and Pressure Drop

After 30 days at 40 °C and 93 percent RH, the case is opened within two hours: five-year specifications allow 30 percent RH inside, ten-year ones 20 percent. Probes sit at the centre and 30 mm above the base, and the higher reading governs.

War Reserve Case: olive-green case open on a bench, dark foam in the lid cut into vial slots, packets in the lower tray
War Reserve Case: olive-green case open on a bench, dark foam in the lid cut into vial slots, packets in the lower tray

Pressure drop is measured in positive pressure, steadier than vacuum: charge to 15 kPa, hold ten minutes, allow 0.8 kPa. A 100 L interior is the baseline and every extra 50 L loosens the limit by 0.15 kPa, so a War Reserve Case of 150 L is judged at 0.95 kPa, after a four-hour soak at 20 plus or minus 2 °C. The breather valve is tested alone: it passes gas at 3 kPa and holds water at 0.5 kPa.

4. Cycling, Stacking and Drop Conditions

A cycle runs ten hours: four at 55 °C and 85 percent RH, two of transition, four at minus 25 °C. Twenty cycles make 200 hours, after which pressure drop may rise by 0.3 kPa at most and the rim must show no whitening.

War Reserve Case: a person in olive uniform carrying a closed case across gravel, a second case open with foam cut-outs
War Reserve Case: a person in olive uniform carrying a closed case across gravel, a second case open with foam cut-outs

The 600 kg figure is a proof load, not a service rating. Service load is one third, about 200 kg, so four tiers of 55 kg cases put 165 kg on the bottom unit.

Drop testing is corner-only: six hours at minus 18 °C, then 1.1 m onto three corners. Inspect the latch keepers before re-testing pressure: a chipped keeper fails a War Reserve Case even when the seal holds.

5. Marking Durability and Inspection Frequency

An in-mould plate takes 500 abrasion strokes under a 1 kg rubber tip, holds colour shift within 3 after 300 hours of UV, and survives 50 ethanol wipes. Laser coding breaks up on the texture, so it stays auxiliary on a War Reserve Case.

LevelTriggerSampleVerdict
Routineevery batch13 below 200 units, 20 below 5002 accept 3 reject visual, 0 accept 1 reject functional
Type test24 months or on material change3all items, any gap means a redo
Markingevery 12 months5abrasion and colour together
Storage reviewat 36 months2 per batchhumidity and pressure only

Salt spray for 96 hours belongs to metal plates and rivets, not plastics. A shorter calendar is not safer either: twelve-monthly type testing only pushes cost into the unit price.

Conclusion

An acceptance standard holds when its limits can be reproduced, not when it runs long: life from an accelerated run, humidity from stated bands, stacking from complete conditions, sampling from fixed frequency. With those fixed in the contract annex, a War Reserve Case reads the same in year five.

This article discusses only the container (case body) side of specifications and design intent, and does not cover any handling, loading or use of the contents.

Related Reading

Related Products