Quick answer: Hopper Feeding starts from hourly usage: a 50 kg hopper, 2 h at 80 ℃, a 6 m suction line with 3 elbows, −0.04 MPa vacuum and 15% regrind.

Table of contents

  • Matching the dryer to the hopper
  • Suction line length and elbow count
  • Regrind port share and position
  • Level control and starvation alarms
  • Material changeover and cross contamination
  • FAQ

1. Matching the dryer to the hopper

Hopper Feeding is sized backwards from consumption, never from machine tonnage. Take the hourly draw first: a 1.1 kg case on one cavity at a 55 s cycle runs about 65 shots an hour, near 72 kg of resin. A 50 kg hopper lasts 40 min at that draw, resin temperature slides once hot air stops, and a 2 h schedule never completes.

Draw, kg/hHopperContinuous runSetup
Under 2025 kg75 minSingle hopper, manual fill
Around 4050 kg75 min50 kg plus auto loader
Around 7050 kg40 min100 kg or twin hoppers
Above 100100 kg60 minTwin hoppers, central dryer

Hopper Feeding dryer capacity shows in two numbers: airflow and heater power. A 50 kg hopper wants 120 m³/h and return air holding at 75 ℃ to keep resin at 80 ℃. Starve the airflow and the surface dries while the core stays damp, which reads as silver streaking on the case wall, so 30 mm of shell insulation belongs in the match.

2. Suction line length and elbow count

On Hopper Feeding, two extra bends let resin bridge inside the pipe, so the hopper looks full but stops feeding. Size on equivalent length: measure horizontal and vertical runs as they are, add 1.5 m per 90 degree elbow and 1 m per swept tee. A 6 m run with 3 elbows lands near 10.5 m equivalent, the practical ceiling for −0.04 MPa.

Hopper Feeding finished yellow and black cases stacked eight high with black interleaving sheets, a worker walking past the machine.
Hopper Feeding finished yellow and black cases stacked eight high with black interleaving sheets, a worker walking past the machine.

Hopper Feeding lines pair bore with air speed. In a 50 mm bore, 18 to 22 m/s keeps pellets moving; below 15 m/s they settle, above 25 m/s they hammer the wall and ground resin cakes at the elbows. Use flexible hose only where the machine moves, no longer than 1.5 m, bond every section to earth, and hold the pickup 50 mm off the sack floor so fines stay out of the filter.

3. Regrind port share and position

On Hopper Feeding, where the regrind port sits decides how evenly it blends. The usual arrangement is a 50 mm spigot at mid-height, regrind falling by gravity while virgin resin enters at the top, the streams meeting in the middle. At the top the regrind floats and leaves first, pushing the real share high; at the base the screw draws it straight out and the share runs low.

Port positionFeed methodShare errorWhere it fits
Top of hopperDrops with dried resin3 to 5 points highSmall volume, same colour
Mid hopperGravity, mixes with level1 to 2 pointsStandard 15% share
Base of hopperStraight to the screw3 to 5 points lowNot for light colours

Hopper Feeding regrind usually starts at 15%. Virgin resin at 8 g/10min moves to about 9 g/10min at that share, still inside the process window; past 25% the latches feel slack at assembly. Ground resin left in an open sack for two days reaches 0.3% moisture, so dry regrind alone for 1 h at 80 ℃ or blend it into dried resin for 10 min before loading.

4. Level control and starvation alarms

Hopper Feeding level control aims at neither an empty hopper nor an overflowing one. A high limit at 85% leaves room for regrind and refills, while 20% is the alarm point; from there to empty is about ten minutes of resin, so alarm-to-attendance must stay under 3 min or the screw runs dry and burnt specks appear.

Hopper Feeding row of presses with red suction hoses running from hoppers, green and yellow resin bags stacked at lower left.
Hopper Feeding row of presses with red suction hoses running from hoppers, green and yellow resin bags stacked at lower left.
Level bandSystem actionOperator action
Above 85%Loading stopsCheck load time setting
50 to 85%Normal cyclingLog the level once per shift
20 to 50%Faster loadingCheck the line for bridging
Below 20%Light and horn, 3 min timerAttend, load by hand if needed

On Hopper Feeding, capacitive pads sit outside the hopper, easy to fit but sensitive to build-up; a rotary paddle enters from the top and reads resin contact, direct but prone to jamming on dust. Fit both, capacitance for trend and paddle for the low limit, then wire the alarm to the stack light and a 5 min slowdown.

5. Material changeover and cross contamination

Hopper Feeding changeover time follows colour and material, and skipping the grading drags dark resin into light parts. Dark to light is the expensive direction: pull the pipe, blow through, wipe the hopper wall, change the filter, purge 5 shots, which is 15 min at best. Light to dark needs a blow-through and 3 shots, about 8 min, while PP to ABS adds a drying change.

ChangeoverWork contentTimeCarry-over risk
Same resin, same colourBlow line and hopper5 minLow
Light to darkBlow-through, 3 purge shots8 minMedium
Dark to lightStrip pipe, wipe, new filter, 5 shots15 minHigh
PP to ABSAbove plus a new drying curve25 minHigh

Hopper Feeding hides one more contamination point, the regrind port. Regrind from the previous resin hangs in that line and drags the old colour into the first blended batch. Strip and blow that line too, then close the changeover with a white-cloth wipe and a dated filter on the machine.